Sequence Number

Work Packages

Title

Due Date (YY/MM)

Nature (R/S/T/O)

Type (P/R/L/I)

D0

WP0

Relationship with other projects

Y1/M7

R

P

I1

WP1

Requirements capture

Y1/M7

R

I

I5

WP2

Review of relevant architectures

Y1/M7

R

I

D1

WP1

REFORM system requirements and analysis

Y1/M10

R

P

I2

WP1

Functional specifications of the REFORM system

Y1/M12

R

I

I13

WP4

Survey of NHs and testbeds

Y1/M12

R

I

I6

WP2

TMN to TINA migration: approach and solutions

Y2/M2

R

I

I14

WP2

Overall architecture of the REFORM system

Y2/M2

R

I

I8

WP4

REFORM testbed configuration

Y2/M3

R

I

D2

WP2

Initial specifications and architecture of the REFORM system

Y2/M4

R

P

I15

WP4

Phase-1 REFORM system evaluation requirements

Y2/M6

R

I

I3

WP1

Self-healing and network robustness algorithms

Y2/M7

R

I

I4

WP1

Routing and load balancing algorithms

Y2/M7

R

I

D7

WP1

Description of self-healing mechanisms, load balancing and dynamic routing capabilities of the REFORM system.

Y2/M7

R

L

I9

WP4

Integration plan for phase-1

Y2/M7

R

I

I11

WP4

Test specifications for phase-1 REFORM system components

Y2/M8

R

I

D3

WP4

Demo of the phase-1 REFORM system

Y2/M9

P

P

D11

WP1

Feedback on the survivability and intelligent resource management algorithms in the phase-1 REFORM system

Y2/M10

R

P

I7

WP3

High level design of the REFORM system

Y2/M11

R

I

D10

WP4

Preliminary evaluation of the REFORM system

Y2/M12

R

P

D13

WP0

Review of project relationships

Y2/M12

R

P

I16

WP1

Phase-2 REFORM system algorithms

Y3/M3

R

P

I18

WP4

Final REFORM testbed configuration

Y3/M3

R

I

D4

WP3

Final REFORM system specifications and architecture

Y3/M4

R

P

I17

WP1

Test requirements for phase-2 functionality

Y3/M5

R

I

I10

WP4

Integration plan for phase-2

Y3/M6

R

I

I12a

WP4

Test specifications for phase-2 REFORM system components for numerical & simulation based tests

Y3/M7

R

I

I12

WP4

Test specifications for phase-2 REFORM system components for testbed based experiments

Y3/M8

R

I

D5

WP4

Demo of the final REFORM system

Y3/M9

P

P

D8

WP4

Integration and validation approach and results of the REFORM system components

Y3/M11

R

P

D6

WP4

Evaluation of REFORM approach and recommendations

Y4/M3

R

P

D12

WP1

Final analysis on the survivability and intelligent resource management algorithms in the REFORM system

Y4/M4

R

P

D14

WP1

The self-healing mechanisms, load balancing and dynamic routing capabilities and algorithms of the REFORM system

Y4/M4

R

L

D9

WP0

Project exploitation plans

Y4/M4

R

P