Sequence Number |
Work Packages |
Title |
Due Date (YY/MM) |
Nature (R/S/T/O) |
Type (P/R/L/I) |
D0 |
WP0 |
Relationship with other projects |
Y1/M7 |
R |
P |
I1 |
WP1 |
Requirements capture |
Y1/M7 |
R |
I |
I5 |
WP2 |
Review of relevant architectures |
Y1/M7 |
R |
I |
D1 |
WP1 |
REFORM system requirements and analysis |
Y1/M10 |
R |
P |
I2 |
WP1 |
Functional specifications of the REFORM system |
Y1/M12 |
R |
I |
I13 |
WP4 |
Survey of NHs and testbeds |
Y1/M12 |
R |
I |
I6 |
WP2 |
TMN to TINA migration: approach and solutions |
Y2/M2 |
R |
I |
I14 |
WP2 |
Overall architecture of the REFORM system |
Y2/M2 |
R |
I |
I8 |
WP4 |
REFORM testbed configuration |
Y2/M3 |
R |
I |
D2 |
WP2 |
Initial specifications and architecture of the REFORM system |
Y2/M4 |
R |
P |
I15 |
WP4 |
Phase-1 REFORM system evaluation requirements |
Y2/M6 |
R |
I |
I3 |
WP1 |
Self-healing and network robustness algorithms |
Y2/M7 |
R |
I |
I4 |
WP1 |
Routing and load balancing algorithms |
Y2/M7 |
R |
I |
D7 |
WP1 |
Description of self-healing mechanisms, load balancing and dynamic routing capabilities of the REFORM system. |
Y2/M7 |
R |
L |
I9 |
WP4 |
Integration plan for phase-1 |
Y2/M7 |
R |
I |
I11 |
WP4 |
Test specifications for phase-1 REFORM system components |
Y2/M8 |
R |
I |
D3 |
WP4 |
Demo of the phase-1 REFORM system |
Y2/M9 |
P |
P |
D11 |
WP1 |
Feedback on the survivability and intelligent resource management algorithms in the phase-1 REFORM system |
Y2/M10 |
R |
P |
I7 |
WP3 |
High level design of the REFORM system |
Y2/M11 |
R |
I |
D10 |
WP4 |
Preliminary evaluation of the REFORM system |
Y2/M12 |
R |
P |
D13 |
WP0 |
Review of project relationships |
Y2/M12 |
R |
P |
I16 |
WP1 |
Phase-2 REFORM system algorithms |
Y3/M3 |
R |
P |
I18 |
WP4 |
Final REFORM testbed configuration |
Y3/M3 |
R |
I |
D4 |
WP3 |
Final REFORM system specifications and architecture |
Y3/M4 |
R |
P |
I17 |
WP1 |
Test requirements for phase-2 functionality |
Y3/M5 |
R |
I |
I10 |
WP4 |
Integration plan for phase-2 |
Y3/M6 |
R |
I |
I12a |
WP4 |
Test specifications for phase-2 REFORM system components for numerical & simulation based tests |
Y3/M7 |
R |
I |
I12 |
WP4 |
Test specifications for phase-2 REFORM system components for testbed based experiments |
Y3/M8 |
R |
I |
D5 |
WP4 |
Demo of the final REFORM system |
Y3/M9 |
P |
P |
D8 |
WP4 |
Integration and validation approach and results of the REFORM system components |
Y3/M11 |
R |
P |
D6 |
WP4 |
Evaluation of REFORM approach and recommendations |
Y4/M3 |
R |
P |
D12 |
WP1 |
Final analysis on the survivability and intelligent resource management algorithms in the REFORM system |
Y4/M4 |
R |
P |
D14 |
WP1 |
The self-healing mechanisms, load balancing and dynamic routing capabilities and algorithms of the REFORM system |
Y4/M4 |
R |
L |
D9 |
WP0 |
Project exploitation plans |
Y4/M4 |
R |
P |